An MBS rig incorporates fully modulating boilers, variable-speed primary pumps, automatic fill/pressurisation unit and integrated controls — all pre-specified for optimum efficiency and preassembled for rapid installation on site.
An MBS rig can achieve a seasonal efficiency of 94%, compared with the requirements of Part L2 of the Building Regulations of 84% in new build and 80% in existing buildings.
MBS modules can pass through a standard doorway and be manoeuvred by one person without using specialist lifting equipment; a sack barrow will suffice.
The modules bolt together, and all power and control cabling is ‘plug-and-play’. Just 45 minutes after offloading the modules, a 160 kW MBS can be fully piped and wired, ready to accept incoming electric feed and external pipe connects.
For more information on this story, click here: Jun, 08 179
Keywords: Armstrong, Heating modules





