To meet the huge variations in water demand, the main booster set is a bespoke Hydro ME set with two half pumps and six main pumps with variable-speed control and a maximum flow of 108 l/s.
|
|
O2 Dome takes centre stage with Grundfos
Published: July 2007
As part of the refitting of the Millennium Dome into the O2 venue for music entertainment and sports, Grundfos worked with M E Engineers to develop pumping solutions that used 36 pumps to provide the full range of M&E services, nine pressurisation units and two booster sets. To meet the huge variations in water demand, the main booster set is a bespoke Hydro ME set with two half pumps and six main pumps with variable-speed control and a maximum flow of 108 l/s. |
Search
E-mail Updates
Most read articles
Poll
In the light of media fears of recession and a credit cruch, do you think this will impact upon the Building-Services industry over the next two years? Calendar
|