Castle wins education project

Castle Building Services Organisation, CBS, University of Central Lancashire, UCLan, Student Centre

Castle Building Services Organisation (CBS), an independent building services design and installation contractor, has announced a significant £6 million education sector contract win for its North West Office.

Working with main contractor, Bowmer + Kirkland, CBS has been appointed to provide a full range of mechanical, electrical and plumbing services on the University of Central Lancashire’s (UCLan) impressive £32 million new build Student Centre in Preston.

CBS is fully prepared for the challenges the glazed building will present, namely heating and cooling solutions to create a comfortable space for students to occupy both for recreation and educational purposes.

Based on its extensive experience of successfully delivering major education projects, coupled with its BIM capabilities, the contractor will adopt its tried and tested ‘build before we build’ ethos to ensure that intricate design and installation details are in place well ahead of its arrival on site in May 2020.

Lee Mitchel, the contractor’s operations director for the North West said: “The building has been designed with flexibility in mind and as such, the building services adopted within it must reflect that. I am confident that our early appointment to the project and longstanding working relationship with the main contractor will support the seamless delivery of the state-of-the-art building.”

Picture credit: Hawkins/Brown Architects 

Related links:



modbs tv logo

‘Red tape scrapping is welcome – but more policy changes are needed’

The CEO of heat pump manufacturer Aira UK has said the government’s new proposals to scrap planning red tape for the installation of heat pumps in the UK will be a big breakthrough for the industry and consumers – but more policy changes are needed.

New procurement rules for NHS suppliers

New procurement rules mean NHS suppliers will need to demonstrate their green credentials so the NHS can achieve its target of becoming net zero for directly-controlled emissions by 2040, with an ambition to reach an 80% reduction in its carbon emissions between 2028 to 2032.