CPN delivers lighting control for new Remembrance Centre

CPN, lighting, building management systems, controls

CPN Lighting has supplied a comprehensive lighting-management system for the new £15.7 million Remembrance Centre at the National Memorial Arboretum. The system uses a range of products to tailor the lighting control to the needs of each space, whilst minimising the environmental impact of operating the building.

Opened by Prince William, the National Memorial Arboretum honours the fallen and recognises service and sacrifice. The Arboretum forms part of the National Forest, with 30 000 maturing trees and over 330 memorials.

The new Remembrance Centre provides a gateway into the 150 acre site and includes exhibition and interpretation spaces, retail space, a restaurants, cafe and learning centre. The centrepiece of the project is a new public square known as Heroes’ Square.

In the restaurant area, CPN Lighting supplied a purpose-built lighting control panel that has both DALI dimming from DALI gateway units and single channel lighting-control modules for mains switching. The brief aimed to utilise natural light within the building to limit the energy used. A scene-setting panel for manual control has up to eight settable scene options, enabling the restaurant to be split into three areas requiring differing light levels with each having a dedicated photocell for individual light control.

The main office area is being controlled by CPN lighting-control modules, each with ten fully addressable channels PIR detectors having a combined detector and photocell, enabling a constant light level to be maintained.

CPN also installed a combination of microwave and presence detectors in corridors and toilets within the building.

For more information on this story, click here: August 2017, 86
Related links:
Related articles:



modbs tv logo

‘Red tape scrapping is welcome – but more policy changes are needed’

The CEO of heat pump manufacturer Aira UK has said the government’s new proposals to scrap planning red tape for the installation of heat pumps in the UK will be a big breakthrough for the industry and consumers – but more policy changes are needed.

New procurement rules for NHS suppliers

New procurement rules mean NHS suppliers will need to demonstrate their green credentials so the NHS can achieve its target of becoming net zero for directly-controlled emissions by 2040, with an ambition to reach an 80% reduction in its carbon emissions between 2028 to 2032.