|
|
Clyde Energy Systems is admitted to Charterhouse
Published: September 2009
Charterhouse School near Godalming in Surrey is upgrading its entire heating system with high-efficiency units from Clyde Energy Solutions. So far 11 CG wall-hung condensing boilers have been installed to heat a range of buildings, including teaching blocks, boarding houses and the theatre. They have outputs from 60 to 100 kW. The boilers are linked to the school’s integrated energy-management system, which allows central control and local over-rides to optimise energy consumption. The school has over 700 pupils, nearly all boarders. The buildings are spread over an extensive site, so a large number of ‘local’ boilers is required. The CG condensing boilers provide the school with a reliable, energy-efficient solution that combines low energy consumption with low water content for fast heat up. For more information on this story, click here:Sept 09, 102 Related articles: |
E-mail Updates
Most read articles
Poll
We're hearing occasional reports that the Building Services industry is starting to pick up again. Does this match your experience? Calendar
|